  • Research on the Maturity Model of Conflict Management in Engineering Project  [EBM 2014]
  • DOI: 10.4236/jss.2014.23002   PP.6 - 10
  • Author(s)
  • Wan Zhang, Hui Zhao
  • ABSTRACT
  • Integrated Project Management Maturity proposed a new concept. It is “Project Conflict Management Maturity”. It established a new concept of maturity level, established an evaluation index system on Project Conflict Management Maturity and used the multi-level fuzzy comprehensive evaluation method combined with the Project Management Maturity model to construct the maturity model of Project Conflict Management. Then, through numerical examples, it evaluated the score of object, got the maturity level of conflict management of the study project, verified the feasibility of the model for solving Project Conflict Management, provided some bases for solving problems of Project Conflict Management and had a certain practical significance about this problem.

  • KEYWORDS
  • Engineering Project; Conflict Management; Multi-Level Fuzzy Comprehensive Evaluation
  • References
  • [1]
    Kang, W. (2011) Research on Conflict Management of Engineering Project of CNPC in South America. China University of Petroleum, Qing Dao (in Chinese).
    [2]
    (America) Project Management Institute (2009) Organizational Level Project Management Maturity Model (OPM3). 2nd Edition, Electronic Industry Press, Beijing.
    [3]
    (America). Harold Author, Zhang, Z.H. and Lv, Y.H. (2002) Project Management Strategic Planning: The Application of Project Management Maturity Model. Electronic Industry Press, Beijing.
    [4]
    Zhang, X.L. (2008) Study of Organization Conflict Management in Project Management. Chongqing University, Chongqing (in Chinese).
    [5]
    Han, L.M. (2007) Research on Fuzzy Evaluation of ERP Project Conflict Management. China Management Informationization, 10 (in Chinese).
    [6]
    Gobeli, D.H., Koenig, H.F. and Bechinger, I. (1998) Managing Conflict in Software Development Teams: A Multilevel Analysis. Journal of Product Innovation Management, 15, 423-435.
    [7]
    Su, S.W. (2012) Study and Application of Fuzzy Comprehensive Evaluation Model in Project Management Maturity of Municipal Investment. Central South University, Changsha (in Chinese).
    [8]
    Xiao, T.M. (2013) Based on AHP and Fuzzy Comprehensive Evaluation of Investment Performance Study of Wild Hill Afforestation YaMaLiKeShan in XinJiang as an Example. Studies of Finance and Economics (in Chinese).

Engineering Information Institute is the member of/source content provider to

http://www.scirp.org http://www.hanspub.org/ http://www.crossref.org/index.html http://www.oalib.com/ http://www.ebscohost.com/ http://www.proquest.co.uk/en-UK/aboutus/default.shtml http://ip-science.thomsonreuters.com/cgi-bin/jrnlst/jlresults.cgi?PC=MASTER&Full=journal%20of%20Bioequivalence%20%26%20Bioavailability http://publishers.indexcopernicus.com/index.php